{"id":1811,"date":"2025-09-09T23:42:12","date_gmt":"2025-09-09T20:42:12","guid":{"rendered":"https:\/\/gazioglu.com\/projeler\/coskunoz-ma-srl\/"},"modified":"2026-01-10T16:07:14","modified_gmt":"2026-01-10T13:07:14","slug":"coskunoz-ma-srl","status":"publish","type":"projeler","link":"https:\/\/gazioglu.com\/en\/projeler\/coskunoz-ma-srl\/","title":{"rendered":"Coskunoz MA SRL"},"content":{"rendered":"\n<p>In 2021, a 2,500 m\u00b2 production facility was designed and constructed for Co\u015fkun\u00f6z MA in Draga\u015fan, Romania. Functional areas were created to support production processes. Structural durability, workplace safety, and operational efficiency were prioritized.<\/p>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 2,500 m\u00b2 facility has been completed in the Co\u015fkun\u00f6z MA Draga\u015fan project.<\/p>\n","protected":false},"featured_media":0,"template":"","kategoriler":[28],"class_list":["post-1811","projeler","type-projeler","status-publish","hentry","kategoriler-completed-projects"],"_links":{"self":[{"href":"https:\/\/gazioglu.com\/en\/wp-json\/wp\/v2\/projeler\/1811","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gazioglu.com\/en\/wp-json\/wp\/v2\/projeler"}],"about":[{"href":"https:\/\/gazioglu.com\/en\/wp-json\/wp\/v2\/types\/projeler"}],"wp:attachment":[{"href":"https:\/\/gazioglu.com\/en\/wp-json\/wp\/v2\/media?parent=1811"}],"wp:term":[{"taxonomy":"kategoriler","embeddable":true,"href":"https:\/\/gazioglu.com\/en\/wp-json\/wp\/v2\/kategoriler?post=1811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}